Brown University
This is an Integrated Project Delivery (IPD) project. The project was coordinated, designed and constructed using the IPD system to construct a world class engineering facility for Brown University.
A complex site situated within Brown University’s active campus. Site work included building demolition; dewatering design, set up and maintenance; over 20’ deep excavations for footings, concrete slabs and utility installation; drilled micro piles for the new buildings structural support; drilled H-beams and wood lagging for earth support; excavating and transporting and disposing over 16,000 tons of contaminated/non-hazardous soil.
Owner: Brown University
Engineers: Buro Happold & Kieran Timberlake
Time Frame: 2 Years
Cost: $5,000,000.00